Our system is an engineered system manufactured in the USA! Our streamlined concrete coating process ensures durability, aesthetic appeal, and long-lasting results for every surface we coat. Here’s what you can expect during our step-by-step application:
Application Steps
Step 1 – Preparation
Preparation Includes shot blasting and/or diamond grinding. Dust is minimized by having all grinders hooked up to vacuum systems.
Step 2 – Concrete Reconstruction
Our menders and fillers are used to fix pits and cracks before the process begins. Our mender is 10x stronger than concrete.
Step 3 – Basecoat
Adpor’s 100% soilds, self-priming pure polyurea base coat is mixed and applied. Our basecoat bonds with the concrete and grows roots into the concrete.
Step 4 – Broadcast Chips
Immediately after the basecoat application, the chips are generously broadcast by hand, providing both color and texture to the floor. Our chips will not fade in direct sunlight.
Step 5 – Scrape
Once the basecoat is fully cured the floor is scraped and vacuumed to remove any loose or vertical standing flakes.
Step 6 – Clear Coat
The final step is to roll out the UV stable polyaspartic clear coat.